Short answer
To price a concrete patio, measure the area and slab thickness, figure cubic yards with a waste factor, price subgrade prep, forming, concrete, reinforcement, and finish, then add labor, overhead, and markup. Present an itemized quote by the square foot. An AI quote builder drafts it in about 25 minutes.
- Measure length by width by thickness to get cubic yards, then add 5 to 10 percent for waste.
- Price subgrade prep, gravel base, forming, rebar or mesh, and the concrete itself as separate lines.
- Price labor by crew-hours for form, pour, and finish, and add any decorative finish premium.
- Add haul-off, overhead, and markup; quote by the square foot so the client can compare.
- Note what triggers a change order, like extra fill or poor soil, and price it in advance.
Step 1: Measure the area and figure yardage
Measure the patio length and width to get square footage, then decide slab thickness, commonly 4 inches for a residential patio. Convert to cubic yards: multiply square feet by thickness in feet, then divide by 27. A 400 square foot patio at 4 inches is about 4.9 cubic yards before waste.
Add a waste factor of 5 to 10 percent for spillage, uneven subgrade, and over-excavation. Concrete is ordered by the yard and you cannot run short mid-pour, so it is cheaper to round up than to call for a second small load at a premium.
Step 2: Price subgrade prep and base
The slab is only as good as what it sits on. Price excavation, grading, and a compacted gravel base as separate line items. In sandy or expansive soils you may need more base or fill, which is real cost and belongs on the estimate, not buried in a lump sum.
List compaction and any geotextile fabric if the site needs it. Prep is where patios fail when it is skipped, so pricing it honestly protects both your reputation and your margin, and it gives the client a reason your bid is not the cheapest.
Step 3: Price forming, reinforcement, and concrete
Price forming by the linear foot of edge, including stakes and release. Add reinforcement: wire mesh or rebar on a grid, plus chairs to hold it at the right height. Then price the concrete itself at your current yardage cost, including any mix upgrades like fiber or a higher PSI.
Control joints and a vapor consideration round out the structural items. Keep each as its own line so the client sees that a patio is more than just the concrete, and so you can adjust one item without repricing the whole job.
Step 4: Price labor and finish
Price labor by crew-hours for setup, forming, pour, and finishing at your loaded labor rate. A plain broom finish is your baseline; a decorative finish like stamped, colored, or exposed aggregate carries a premium for the extra time, materials, and skill, so price it as a separate upgrade line.
Finish work is where a patio earns its appearance and where an inexperienced bid underprices the labor. Use your crew's real production rate for the finish you are quoting, because a stamped pour takes far longer than a broom finish of the same size.
Step 5: Add overhead and markup, then present the quote
Add haul-off for spoils, overhead for your trucks and insurance, and markup for profit on top of direct costs. Quote the patio by the square foot so the client can compare your bid against others on a common basis, and list decorative upgrades separately so they can choose.
Note change-order triggers up front: extra fill, poor soil, or a tear-out of an existing slab. With ContractShield you snap photos, describe the patio, and the AI drafts the quote against your own rates in about 25 minutes, then you set milestone payments so you collect a deposit and a pour-complete payment instead of waiting. 2% per payment, capped at $250. No per-lead fees. Card payments add processing.
Frequently asked questions
How do I calculate concrete for a patio?
Multiply square feet by thickness in feet, then divide by 27 to get cubic yards. A 400 square foot patio at 4 inches is about 4.9 yards. Add 5 to 10 percent for waste.
How thick should a concrete patio be?
Commonly 4 inches for a residential patio, thicker where it carries heavier loads. Confirm against local code and the specific use.
Why price subgrade prep separately?
Prep is where patios fail when skipped, and sandy or expansive soils need more base or fill. Pricing it honestly protects your margin and explains why your bid is not the cheapest.
How much more is a decorative finish?
Stamped, colored, or exposed-aggregate finishes carry a premium for the extra time, materials, and skill. Price the finish upgrade as a separate line at your crew's real production rate.
How fast can I price a patio with software?
With an AI quote builder like ContractShield, about 25 minutes from the measure to a signable estimate, drafted against your own rates.
What does ContractShield cost for a concrete job?
2% per payment, capped at $250. No per-lead fees. Card payments add processing. No seat fee and no per-lead charge.
Price your next concrete patio in about 25 minutes
Snap photos, describe the patio, and let the AI draft an itemized quote against your own rates.
Keep reading
- How to estimate concrete for a slabGet your yardage right.
- How to price a paver patioCompare the paver alternative.
- How to set your markupTurn cost into price.
- Concrete software in OrlandoSee concrete estimating tools in your metro.
- AI bid builderPhotos and notes become a line-item quote.
- Start a free trialLoad your concrete price list in minutes.
Canonical: /seo/guides/how-to-price-a-concrete-patio