Short answer

Knowing how to handle a change order comes down to three habits: document the change in writing the moment it comes up, price it against your own rates, and get the client to approve it before you do the work. Then bill it on the next milestone. A clear change-order process is how a contractor stops eating scope creep and keeps the original margin intact.

  • Document every change the moment it is raised, in writing, with photos if useful.
  • Price the change against your own rates, including labor, materials, and any schedule impact.
  • Get written approval before you do the work, not after.
  • Bill the approved change on the next milestone, not as a surprise at the end.
  • A standing change-order process protects the margin you quoted.

What is a change order and why does it matter?

A change order is a documented agreement to change the scope, price, or schedule of a job after the contract is signed. It covers two situations: the client asks for something new, and the job reveals a hidden condition that has to be addressed. Both are normal. What is not normal, and what quietly destroys contractor margins, is doing that extra work without documenting and pricing it.

Every contractor has a story about the small favor that grew into days of unpaid work. The change order is the tool that keeps a reasonable request from becoming free labor. It also protects the relationship: when the process is clear from the start, the client is not surprised by the cost, and you are not stuck choosing between your margin and the friendship.

How do you price a change order fairly?

Price a change order the same way you priced the base bid: from your own labor and material rates, not a guess and not a discount to avoid an awkward conversation. Include the direct cost of the added work, the markup you apply to everything, and any schedule impact. A change that adds two days might also push the start of your next job, and that cost is real.

Be specific and itemized. A change order that says new work, $2,000 invites argument. One that lists the added labor hours, the materials, and the markup shows the client exactly what they are buying, the same transparency that won you the job. Fair pricing is not the lowest number; it is an honest number you can defend.

Why does written approval before work matter so much?

The sequence is the entire game. If you get written approval before you do the work, you have the upper hand and a clear agreement. If you do the work first and ask after, you have neither, and the client can reasonably argue they never agreed to the cost.

Written does not have to mean a lawyer. A signed line in your project software, an approved change order the client clicks, or even a confirming message is far better than a handshake. The point is a record that both sides saw the price and said yes. On ContractShield you issue a change order from the field, the client approves it on their phone, and the approval is logged, so there is no he-said-she-said at the end of the job.

How should a change order be billed?

Bill an approved change order on the next milestone, folded into the normal payment schedule, rather than saving a pile of extras for a surprise final invoice. Clients handle a documented, approved increase on a milestone far better than a mysterious jump at the end.

This is where billing and documentation should live together. On ContractShield, a change order you issue and the client approves flows straight into the next milestone invoice through Stripe, with the same automatic reminders as any other payment. The platform fee does not change: 2% per payment, capped at $250. No per-lead fees. Card payments add processing. The result is that scope creep, which used to come out of your pocket, becomes tracked, approved, paid work.

Frequently asked questions

What counts as a change order?

Any change to scope, price, or schedule after the contract is signed, whether the client requested it or the job revealed a hidden condition. Both should be documented and priced.

Do change orders need to be in writing?

Yes. Written approval before the work protects your payment and the relationship. A signed line in your project software or an approved digital change order is enough; a handshake is not.

How do I price a change order?

Use your own labor and material rates, add your normal markup, and include any schedule impact. Itemize it so the client sees exactly what the added work costs.

When should I bill a change order?

On the next milestone, folded into the normal schedule, so the client is not surprised by a pile of extras on the final invoice.

Can software manage change orders?

ContractShield lets you issue a change order from the field, get the client to approve it on their phone, and bill it on the next milestone, with the approval logged so there is no dispute later.

Stop eating scope creep

Issue a change order from the field, get approval before you work, and bill it on the next milestone. 2% per payment, capped at $250. No per-lead fees. Card payments add processing.

Canonical: /seo/guides/how-to-handle-a-change-order