How to Bid a Tenant Improvement Job | Reddit & LinkedIn
Short answer
How to bid a tenant improvement job, break the job into a measured scope, materials at your supplier cost, and labor at your burdened rate, then add markup and a small contingency. Price each as its own line and present one signable quote. Itemizing protects your margin when the scope changes.
- Start with a measured scope before you price anything.
- Price materials and labor as separate lines, labor at your burdened rate.
- Add markup on top of cost, plus a contingency for the unknowns.
- Present one signable quote the client can accept online.
- ContractShield drafts the quote from your templates in about 25 minutes.
What are the steps to bid a tenant improvement job?
Work the job in order so nothing gets priced twice or missed. Step 1, review the plans and scope: Read the TI plans, finish schedule, and landlord work letter so you know what is in and out of scope. Step 2, solicit sub pricing: Get bids from mechanical, electrical, plumbing, and finish subs with a clear scope each. Step 3, build the estimate: Roll up sub bids, self-performed work, general conditions, permits, and a contingency. Step 4, add overhead and fee: Apply your general conditions, overhead, and fee, and check the number against the budget. Step 5, present a clear bid: Present a signable bid with assumptions, exclusions, and a milestone payment schedule.
Each step feeds the next. A measured scope drives the material list, the material list and labor hours drive the subtotal, and your markup and contingency turn that subtotal into a number you can stand behind. Skipping a step is how a quote ends up short, and a short quote comes out of your own pocket on a fixed-price job.
What does it take to bid a tenant improvement job?
Getting bidding a commercial tenant improvement build-out as a general contractor right starts with a clear scope and your own cost data. To bid a Tenant Improvement Job accurately, break the job into materials, labor, and any permits or fees, then price each from numbers you control instead of a rough guess.
The contractors who win more work and keep more margin are the ones who quote fast without cutting corners on the estimate. A documented, itemized number protects you if the scope changes later, because a clean change order replaces a margin hit you would otherwise absorb.
What are the biggest cost drivers?
On this kind of job the cost usually swings on a few variables: the condition of what you are working on, access and site constraints, and the quality tier the customer chooses. Price those as separate lines so the customer can see where the money goes and so an upgrade or a surprise becomes a clean change order.
Always price labor at your burdened rate, not a bare wage. Burden includes payroll taxes, insurance, and the real overhead of running the crew. Quoting off an unburdened rate is the most common way small contractors quietly lose money on an otherwise good job.
How do you present the number so it closes?
Present one signable document the customer can read and accept online, not a pile of back-and-forth emails. Lead with the scope, show itemized lines, and state your terms: deposit, milestone payments, and what is excluded. Clarity closes jobs because it tells the customer you are organized and fair.
Speed matters too. A same-day quote beats one the customer waits on for days. The faster your estimate goes out while the job is fresh in the customer mind, the higher your close rate.
What is a common mistake contractors make here?
The most common mistake is quoting from memory instead of from numbers. A contractor who eyeballs the price tends to anchor on the last similar job, not on today material cost or the real hours this job will take. Material prices move, and a number that was fair last season can quietly turn into a loss.
The second common mistake is leaving the scope vague. If the quote does not spell out what is included, every assumption becomes an argument later. Write the exclusions down. A one-line note that a repair does not include repainting the whole wall saves a dispute and a giveaway down the road.
How do you handle scope changes mid-job?
Use a written change order every time. When the customer asks for more, or you uncover a hidden condition once work is underway, stop and price the change before you do the work. Capture the added scope, the added cost, and the new timeline, and get a quick approval.
Contractors who skip the paperwork and do the extra work on a handshake are the ones who eat the cost. A fast, clear change order protects the relationship and your margin at the same time, because the customer sees exactly what changed and why the price moved.
How does ContractShield speed this up?
ContractShield turns this whole process into about 25 minutes. Snap up to six job photos, say or type what the job is, and the AI drafts labor, materials, and markup from your own price templates. Every line shows where its price came from, and the AI never invents labor rates or markup, so the numbers stay yours.
Once the customer accepts the quote online, milestone payments are built in: a deposit, progress draws, and a final payment, invoiced automatically through Stripe. If a balance goes past due, Collections chases it for you. The tool that priced the job also gets you paid for 2% per payment, capped at $250. No per-lead fees. Card payments add processing.
Frequently asked questions
What is the first step to bid a tenant improvement job?
Start with a clear, measured scope. Document exactly what the job includes before you price anything, because an accurate material and labor list depends on knowing the real scope.
How much markup should a contractor add?
It depends on your overhead and target profit, but many small contractors run roughly 15% to 25% markup on cost. Remember markup is not margin: a 25% markup is a 20% margin, so price from the margin you need to keep.
Should labor be priced at the wage or the burdened rate?
Always the burdened rate. Burden includes payroll taxes, insurance, and overhead. Quoting off a bare wage is the most common way contractors lose money on a job that looked profitable.
How fast can I turn this into a signable quote?
With ContractShield, about 25 minutes from site visit to a quote the client can accept online. The AI drafts from your templates and you approve each line.
What does ContractShield cost?
2% per payment, capped at $250. No per-lead fees. Card payments add processing. The 2% is split 1% client and 1% contractor at invoicing, and the cap applies to each payment. There are no seat fees.
Quote, run, and get paid on one platform
ContractShield: build an AI quote in about 25 minutes, run the job from the truck, and collect on milestones.
Keep reading
- How to manage subcontractors as a general contractor
- How to respond to a construction rfp
- How to write a contractor bid
- AI bid builderDraft a quote from photos in minutes.
- Automatic invoice collectionsOverdue invoices chase themselves.
- Start a free trialBuild your first quote in about 25 minutes.
- See pricing
Canonical: /seo/guides/how-to-bid-a-tenant-improvement-job