How to Quote a Whole-House Repipe | Reddit & LinkedIn

Short answer

To quote a whole-house repipe, map the plumbing system and count fixtures, then scope wall and ceiling access, since drywall cut-out and patch is a major cost. Estimate labor per fixture and run, price pipe, fittings, and the permit, add markup and a contingency for hidden conditions, and present milestones tied to inspection. Access drives the price.

  • Fixture count and run length frame the labor, access decides the rest.
  • Drywall cut-out and patch is often the biggest hidden cost line.
  • PEX and copper price differently in both material and labor.
  • Tie payment milestones to rough-in and final inspections, not dates.
  • Carry a contingency for slab routing and code upgrades in old homes.

What goes into a whole-house repipe quote?

A repipe quote has five parts: plumbing labor, pipe and fittings, wall and ceiling access, the permit and inspections, and a contingency for what hides in an old house. The mistake that sinks fixed-price repipes is quoting the plumbing and forgetting the drywall and paint that access requires.

Start by mapping the system. Count fixtures, find the main, and trace the runs, then confirm what you are removing, whether galvanized, polybutylene, or failing copper, and what you are installing. That map is the backbone of an accurate estimate and a schedule the client can trust.

How does wall access change the price?

You cannot repipe a house without opening walls and ceilings, and that drywall cut-out, patch, texture, and paint is frequently the single largest non-plumbing cost. Decide where you must open and price it as its own scope, or state clearly whether the client or another trade handles patch and paint.

Access also drives labor time. A slab home with routing through the attic prices differently from a crawl-space or basement home. Walk the house and price the real access path, because a repipe quoted as if the walls are already open will lose you money on every job.

How do you estimate repipe labor and materials?

Estimate labor per fixture and per run for rough-in, plus the manifold or trunk-and-branch layout you are installing, over your loaded plumbing rate. PEX is generally faster to run than copper, while copper carries higher material cost and more skilled labor, so price the material the client actually chose.

List materials in detail: pipe, fittings, valves, hangers, and the permit, and add water heater replacement or pressure-regulation work if it is in scope. A detailed material list is what lets you defend the number when a client compares it to a vague one-line bid from a competitor.

What markup and milestones fit a repipe?

Mark up materials 15 to 25% and add a contingency, usually 8 to 12%, for hidden conditions like buried code violations, slab routing surprises, or a section of wall that hides more than expected. Name the contingency and credit back what you do not use.

Tie payment to inspectable milestones: a deposit, a rough-in draw when the rough passes inspection, and a final payment at the passed final. ContractShield builds this quote from photos in about 25 minutes. Snap the job, say or type the scope, and the AI drafts labor and materials from your own price templates, line by line for you to approve. Every line shows whether the price came from your template or an AI estimate, and it never invents your labor rate or markup. Then the same tool invoices the milestones and chases any overdue balance for you, all for a flat 2% per job, 1% client and 1% contractor, capped at $250 per job, with no per-lead fees ever.

Frequently asked questions

How long does a whole-house repipe take?

Most homes take two to five days depending on fixture count, access, and whether walls must be opened and patched. Price the access and patch work as its own scope, because it often outweighs the plumbing labor.

Is PEX or copper cheaper to repipe with?

PEX is usually faster to install and lower in material cost, while copper costs more in both material and skilled labor. Quote the material the client chose and price the labor difference honestly.

Who patches the drywall after a repipe?

State it clearly on the estimate. Either you price cut-out, patch, texture, and paint as part of the scope, or you note that the client or another trade handles it. Ambiguity here causes most repipe disputes.

How much contingency should a repipe include?

Typically 8 to 12% for hidden conditions in older homes, such as slab routing, code upgrades, or walls that hide more than expected. Name it on the estimate and credit back what you do not use.

How fast can I quote a repipe?

With ContractShield, map the fixtures, photograph the access, and the AI drafts labor and materials in about 25 minutes. You approve each line so the numbers stay yours.

What is the ContractShield fee?

A flat 2% per job, 1% client and 1% contractor, capped at $250 per job, with no per-lead fees ever, split 1% client and 1% contractor at invoicing and capped at $250 per job. No seat fees, no per-lead charges.

Quote your next repipe in about 25 minutes

Scope access, price the plumbing, and invoice on inspection milestones with ContractShield.