To price a French drain, measure the linear run and the depth, confirm where the water will outlet, then price gravel, perforated pipe, filter fabric, and excavation labor. Add markup and a contingency for rock or utilities. Depth and outlet access are the two biggest cost drivers.
- Measure the run in linear feet and the depth, then confirm a legal, gravity-fed outlet.
- Price washed gravel, perforated pipe, and filter fabric as separate material lines.
- Excavation labor and spoil removal usually cost more than the materials.
- Rock, roots, and buried utilities are the common surprises. Carry a contingency.
- Add markup on top of cost, and document the outlet so there is no dispute later.
What goes into the cost of a French drain?
A French drain quote has three buckets: materials, excavation labor, and spoil handling. Materials are gravel, perforated pipe, and filter fabric, which are relatively cheap. The real cost is moving dirt: digging the trench to depth and hauling the spoil away.
The cost driver customers never see coming is the outlet. A French drain is gravity fed, so the water has to run downhill to daylight, a dry well, or a storm connection. If the yard is flat or the outlet is far away, you may need a longer run, a deeper trench, or a pump, and that changes the price materially. Confirm the outlet before you put a number on paper.
How does depth change the price?
Depth is the quiet budget driver. A shallow curtain drain is fast. A deep footing drain along a foundation means a lot more spoil, slower digging, and sometimes shoring for safety. Every extra foot of depth multiplies labor and haul-off, not just adds to it.
Measure the required depth against what the water problem actually needs, not a default. Over-digging wastes money and under-digging leaves the customer with a drain that does not solve the problem. Price the depth you need, document it, and explain to the customer why a basement-wall drain costs more than a surface drain in the lawn.
What are the common surprises on a drain job?
Three things routinely blow up a drainage estimate: rock, roots, and utilities. Hitting ledge rock can stop a machine cold and force hand work or breaking. Mature tree roots slow a trench and may require rerouting. And a buried gas, water, or electric line that was not located is both a safety hazard and a schedule killer.
Always call for utility locates before you dig, and probe for rock during the walkthrough. Then carry a contingency, often 10% or more on drainage work, because subsurface conditions are the one thing you cannot fully see when you quote. A documented contingency is more honest than a surprise change order.
How much should you mark up a drainage job?
Markup on excavation and drainage work commonly runs 20% to 30% on direct cost for a small contractor, reflecting the equipment, the risk, and the unknowns underground. Your own overhead and target profit set the real number. Remember markup is not margin: a 25% markup is a 20% margin.
Drainage carries more risk than most landscape work because so much is hidden until you dig. Price that risk honestly rather than shaving the bid to win, because a drain that fails or a dig that hits rock will eat any thin margin and then some. Build the contingency in and present it plainly.
How can software speed up a drainage quote?
The fastest path from site visit to signed quote is to draft against your own templates. ContractShield lets you snap photos of the water problem, the grade, and the outlet, say or type the scope, and get an AI draft of gravel, pipe, fabric, and excavation labor in about 25 minutes total. You approve each line, and every line shows where its price came from, so the numbers stay yours.
Once the customer accepts online, milestone payments are built in, with automatic reminders and collections if a balance goes past due. The same tool that priced the job also gets you paid, and the documented scope protects you if the customer questions the outlet later.
Frequently asked questions
What is the biggest cost driver on a French drain?
Excavation, not materials. Trench depth, soil type, and spoil haul-off drive the labor hours, and the outlet distance can force a longer or deeper run. Gravel and pipe are the cheap part.
Why does the outlet matter so much?
A French drain is gravity fed, so water must run downhill to daylight, a dry well, or a storm connection. A flat yard or a distant outlet can require a longer run, a deeper trench, or a pump, all of which raise the price.
How much contingency should I carry?
Often 10% or more on drainage work, because rock, roots, and buried utilities are hidden until you dig. A documented contingency is more honest than surprising the customer with a change order.
Do I need utility locates before quoting?
Call for locates before you dig, and probe for rock during the walkthrough. A buried gas, water, or electric line is both a safety hazard and a schedule killer that can change the price.
Can ContractShield quote a drainage job for me?
Yes. Snap photos, describe the scope, and the AI drafts gravel, pipe, fabric, and excavation labor from your own templates in about 25 minutes. You approve each line, and milestone payments are built in.
Quote, run, and get paid on one platform
ContractShield: build an AI quote in about 25 minutes, run the job from the truck, and collect on milestones.
Keep reading
Canonical: /seo/guides/how-to-price-a-french-drain-installation